GLASS WINDOWS FURNISH AND INSTALL; LOW-E INSULATED GLASS WINDOW TO BE INSTALLED ON SOUTH-END HALLWAY OF SURGERY FLOOR 1 (ONE) 32" X 86" X 1" LOW-E 3M SCOTCHTINT PLUS VENDOR TO PROVIDE LABOR, MATERIALS, AND ALL CLEAN UP AND REMOVAL OF DEBRIS TO NECESSARY TO INSTALL GLASS (5 GLAZIERS).

GLASS WINDOWS FURNISH AND INSTALL; LOW-E INSULATED GLASS WINDOW TO BE INSTALLED ON SOUTH-END HALLWAY OF SURGERY FLOOR 1 (ONE) 32" X 86" X 1" LOW-E 3M SCOTCHTINT PLUS VENDOR TO PROVIDE LABOR, MATERIALS, AND ALL CLEAN UP AND REMOVAL OF DEBRIS TO NECESSARY TO INSTALL GLASS (5 GLAZIERS).

参考: A# 91217

地位: 获奖

文件:

没有找到文件。
zh_CNChinese